- Park in shutdown
- Repowering authorised on 24/07/2020
- Dismantling of 10 x 0.75 MW Jeumont J48 wind turbines
- Construction of 5 x 2.3 MW Enercon E70 wind turbines
- Installed power after repowering: 11.5 MW
- Located in the communes of Escales and Conilhac-Corbières (11)
Artigues & Ollières
/ wind power2020 – to the present
Main characteristics
Our missions
- Preparing the site
- Bank financing
- Consulting companies
- Monitoring the site: dismantling & construction
- Managing local relations