Cers - repowering

Wind Power

2020 – to the present

MAIN CHARACTERISTICS  

  • Park in shutdown
  • Repowering authorised on 24/07/2020
  • Dismantling of 10 x 0.75 MW Jeumont J48 wind turbines
  • Construction of 5 x 2.3 MW Enercon E70 wind turbines
  • Installed power after repowering: 11.5 MW
  • Located in the communes of Escales and Conilhac-Corbières (11)

OUR MISSIONS  

  • Preparing the site
  • Bank financing
  • Consulting companies
  • Monitoring the site: dismantling & construction
  • Managing local relations